Back
Concrete Works

Maru Concrete Works’ Traditional Christmas Cruise to Helsinki

We went on our traditional “Christmas cruise” to Helsinki with the Maru Betoonitööd team. This year, we held our “pikkujoulut” at the Radisson Red Hotel, located at Vuorikatu 24, which we built. The “Christmas cruise” is a great opportunity for our designers and estimators to familiarize themselves with the work at the site, and for members of the construction team to visit the company’s other sites and meet colleagues they don’t see on a daily basis. Two years ago, we visited the site at Vuorikatu 24 to see how the basement structures carved into the rock were taking shape and how they were being connected to the car tunnel running through downtown Helsinki; last year we were able to enjoy city views from the roof of the site, which had already reached its full height, and this year, we were able to take a steam bath in the sauna of the Radisson Red Hotel—which had been handed over by Jatke—and celebrate “Pikkujoulu” with our Helsinki colleagues at the restaurant.

As usual, we visited the sites where we are currently working. In collaboration with Haahtela Rakennus, we are building a laboratory center in Espoo. We were able to observe the formwork for the monolithic concrete basement ceiling, the installation of steel columns, beams, and stiffening elements, the placement of concrete elements, and preparations for monolithic pouring. We discussed with the Haahtela team the challenges of winter concrete work, how to work together to ensure normal working conditions, what covering and heating measures to use, and how to ensure access routes and lighting.

Together with Fira Rakennus, we are building the Hybridiarena sports and recreation center in Kivenlahti, Espoo. At this site, we were able to observe how the monolithic shafts were constructed prior to the installation of the prefabricated elements, and marvel at the installation of wall panels nearly ten meters high, 22-metric-ton columns, and 25-meter-long TT panels. During our visit, reinforcement work was underway on the hockey rink floor, and the second-floor cast-in-place floor was being poured.

We also went to see what the concrete structures we built look like at SRV Rakennus’s Woodcity2 project in Jätkasaari, which is predominantly a wood-frame structure. We took a look at what the waterproof exterior walls of the basement and the utility shafts look like, as well as the concrete connection nodes that join the steel and wood elements, and we discussed the role of concrete structures in timber-frame construction with SRV’s project manager.

At the end of a busy day, we also managed to make a quick stop by our Helsinki office.

Back
Developed by Reaktiiv