Steel Structures for Eesti Energia Tehnoloogiatööstuse AS
Description
Ragn–Sells RDF Plant is unique in a way that it is capable of recycling 85% of handled waste. The technology of this refuse derived fuel plant sets all new standards in the entire Scandinavia. As a result, the high quality waste fuel supply could be used by different boiler plants in Estonia and abroad.
Design and construction of the Ragn-Sells refuse derived fuel plant was a complicated task that required the utmost reponsibility, effort and learning ability of the entire Maru team. Complex technology forced strict requirements to general construction and cooperation between different international parties. BIM modeling, that is still very uncommon in Estonia, was applied in design process. Construction procedure involved various lean construction techniques.
Description
Ragn-Sells RDF Plant is unique in a way that it is capable of recycling 85% of handled waste. The technology of this refuse derived fuel plant sets all new standards in the entire Scandinavia. As a result, the high quality waste fuel supply could be used by different boiler plants in Estonia and abroad.
Design and construction of the Ragn-Sells refuse derived fuel plant was a complicated task that required the utmost reponsibility, effort and learning ability of the entire Maru team. Complex technology forced strict requirements to general construction and cooperation between different international parties. BIM modeling, that is still very uncommon in Estonia, was applied in design process. Construction procedure involved various lean construction techniques.
Description
Enefit-280 Oil Plant is by far the largest project in the history of Maru Ehitus due to the tonnage of its steel structures. It also serves as a perfect example to demonstrate the excellent teamwork skills of different subsidiaries within the Maru Group. Steel construction was produced by Maru Metall and designwork was done in cooperation with German engineering firm, general contractor Outotec GmbH, and the designers of Maru Ehitus and Maru Metall. Erection work was conducted by the subsidiary company of Maru Ehitus, Maru THM. Work that was completed within the estimated timeline showed the proficiency of excellent teamwork between the various facilities of the Maru Group and also provided a great experience to all.