References
40 MW Pellet-fired Heating Plant in Turku, Finland
| Location: | Turku, Finland |
| Capacity: | 155 T |
| Project manager: | Mikk Helleste |
Description
In Spring 2015 Maru Metall AS signed a contract to produce steel frames for 40 MW Pellet-fired Heating Plant in Turku, Finland. The contract involves the production of about 155 tons of steel structures, in addition railings, gratings, steps, etc.
Similar references

AS Silikaat laohoone
Industrial and Warehouse Buildings

FEB AS Sales Center in Tallinn
Industrial and Warehouse Buildings

LKAB Cladding Assembly, Roof Works and Rainwater Systems
Industrial and Warehouse Buildings

Pellet Fired District Heat Boiler Plant in Salmisaari
Industrial and Warehouse Buildings



