References
40 MW Pellet-fired Heating Plant in Turku, Finland
| Location: | Turku, Finland |
| Capacity: | 155 T |
| Project manager: | Mikk Helleste |
Description
In Spring 2015 Maru Metall AS signed a contract to produce steel frames for 40 MW Pellet-fired Heating Plant in Turku, Finland. The contract involves the production of about 155 tons of steel structures, in addition railings, gratings, steps, etc.
Similar references

Erection of Production and Office Building for Karl Storz Video Endoscopy Estonia
Industrial and Warehouse Buildings

300 MW Power Plant of Eesti Energia. Turbine Hall and Other Structures. Verification and Certification of Project Documentation. Design and Modelling of Steel Joints. Erection and Workshop Drawings.
Industrial and Warehouse Buildings

Viru Synchronous Condenser Station for Elering
Industrial and Warehouse Buildings

Brewery Tanks Facility for Saku Brewery
Industrial and Warehouse Buildings



