References
Redi “Kalasatama” Bridges Between Shopping Centres
Location: | Helsinki, Finland |
Capacity: | 195 T |
Project manager: | Mikk Helleste |
Description
In summer 2016 Maru Metall AS and Maru THM OÜ signed an agreement to produce and install steel structures for a bridge in Finland. The agreement covers about 195 T of manufacturing and installing steel constructions. In addition installation of wall elements and roof.