References
IRU CHP Plant
| Customer: | AS Merko Ehitus Eesti |
| Location: | Iru, Harjumaa, Estonia |
| Project manager: | Alexander Samoylenko (Maru THM OÜ) |
| Projektiinsener: | Mikk Helleste |
AS Maru Metall signed a contract with AS Merko Ehitus Eesti on 17th of August in 2011. According to the contract the biggest Waste to Energy plant in Baltic and the first in Estonia has to be established. The contract includes manufacturing and steel structures erection. AS Maru Metall produces assemblies and Maru THM OÜ is responsible for erection works. The project total capacity is about 850 tons of steel structures and additionally 45 tons of handrails, 1300 m2 of gratings, 300 m2 tear drop plates etc. More than 50% from all capacity were welded beams and welded columns. The project biggest beam total weight is almost 20 tons.
Similar references

300 MW Power Plant of Eesti Energia. Turbine Hall and Other Structures. Verification and Certification of Project Documentation. Design and Modelling of Steel Joints. Erection and Workshop Drawings.
Industrial and Warehouse Buildings

Warehouse Extension for Balti Autoosad AS
Industrial and Warehouse Buildings

Anvol OÜ lao- ja kontorihoone
Industrial and Warehouse Buildings

Steel Erection for Viljandi Aken & Uks Production Building
Industrial and Warehouse Buildings