References
Molde Gallery
Location: | Molde, Norway |
Capacity: | 60 T |
Project manager: | Mikk Helleste |
Description
Maru Metall AS signed an agreement in the winter of 2015 to produce and install steel constructions of a gallery in Norway. The gallery is built over a road and connects two separate buildings.