References
300 MW Powerplant of Eesti Energia – CFB Boiler Building
Customer: | EA Reng AS / CITEC OY AB |
Location: | Auvere küla, Vaivara vald, Ida-Virumaa |
Description: | Verification and certification detail design drawings and documentation of main- and secondary structures |
Capacity: | ca 7000 t |
Project manager: | Tambet Vähi |
Similar references

AS Maru Metall tootmishoone laiendus
Industrial and Warehouse Buildings

Extension to Production and Commercial Building for Windak OÜ
Industrial and Warehouse Buildings

Warehouse Extension for Balti Autoosad AS
Industrial and Warehouse Buildings

Extension to Production Building for Lunden Food OÜ
Industrial and Warehouse Buildings