Extension to Espak Store
Kirjeldus
Vundamendi kirjeldus: kannvundamendid karkassile ja lintvundament keldriseintele
Karkassi kirjeldus: komposiitpostid TT- ja HQ-taladega, r/b-trepikoda
Katusekandjate kirjeldus: r/b õõnespaneelid
Seinakonstruktsioonide kirjeldus:teraskarkass+termoroov; õõnesplokk+termoroov
Maru Ehitus AS: Ehituse peatöövõtt
Maru THM: karkassi paigaldus
Description
The Väo CHP plant is one of the largest structures of its kind in Estonia. The relatively rapid time schedule for installation and the execution of the work during the winter, made the
project quite intense. To date, this has been the highest structure that we have built (highest surface 34 m above ground).
Description
The reconstruction of the old boiler house into a bio-boiler house that is fueled by hay is a good example of the implementation of new technologies. Our job was to partially demolish the old building and build the hay warehouse.
A unique detail was the fact that the hay warehouse was covered with a PVC cover, which guaranteed the fast installation of the roof and provided excellent lighting for the warehouse.
Description
Enefit-280 Oil Plant is by far the largest project in the history of Maru Ehitus due to the tonnage of its steel structures. It also serves as a perfect example to demonstrate the excellent teamwork skills of different subsidiaries within the Maru Group. Steel construction was produced by Maru Metall and designwork was done in cooperation with German engineering firm, general contractor Outotec GmbH, and the designers of Maru Ehitus and Maru Metall. Erection work was conducted by the subsidiary company of Maru Ehitus, Maru THM. Work that was completed within the estimated timeline showed the proficiency of excellent teamwork between the various facilities of the Maru Group and also provided a great experience to all.