IRU CHP Plant
Customer: | AS Merko Ehitus Eesti |
Location: | Iru, Harjumaa, Estonia |
Project manager: | Alexander Samoylenko (Maru THM OÜ) |
Projektiinsener: | Mikk Helleste |
AS Maru Metall signed a contract with AS Merko Ehitus Eesti on 17th of August in 2011. According to the contract the biggest Waste to Energy plant in Baltic and the first in Estonia has to be established. The contract includes manufacturing and steel structures erection. AS Maru Metall produces assemblies and Maru THM OÜ is responsible for erection works. The project total capacity is about 850 tons of steel structures and additionally 45 tons of handrails, 1300 m2 of gratings, 300 m2 tear drop plates etc. More than 50% from all capacity were welded beams and welded columns. The project biggest beam total weight is almost 20 tons.
Similar references

Rare Earth Permanent Magnet Manufacturing Facility for NPM Narva
Industrial and Warehouse Buildings

Production Plant Extension for Maru Metall AS
Industrial and Warehouse Buildings

Cargo Terminal at Lennuradari tee 34
Industrial and Warehouse Buildings

Wood Processing Flagship Plant in Imavere (First Stage)
Industrial and Warehouse Buildings