PVC Hangar 40x69x8,1m in Kuopio
Description
In Summer 2015 AS Maru Metall signed a contract to produce a bridge in Imatra, Finland.
The bridge has a total length of 120 meters and consists of six modules.
Description
In spring 2016 Maru Metall AS and Maru THM OÜ signed an agreement to produce and install steel structures for a pipe bridge in Finland. The agreement covers about 95 T of manufacturing and installing steel constructions. In addition installation of wall elements, roof and windows.
Description
In the beginning of the year 2014 AS Maru Metall and Maru Rakennus OY signed a contract to produce steel structures for a heating plant. The contract includes the production of about 80 t of steel structures, including ladders, handrails, grilles, steps, etc..
The building will be finished in 2014.
Description
AS Maru Metallsigned a contract in the summer of 2015 to produce a steel frame for biomass fired steam boiler plant in Lahti.The contract witholds ca 180 tons of steel, in addition railings, gratings, steps, etc. The building is finished in 2015.