Joutseno Gasifier Building

Description

Maru Metall signed an agreement with Outotec GmbH on January 2nd 2013 to design and produce steel frames for gas treatment plant built on LKAB territory. The contract covers the production of approximately 750 t of steel structures, in addition ladders, stainless steel handrails, grilles, steps, etc.

AS Maru Metall signed a contract with AS Merko Ehitus Eesti on 17th of August in 2011. According to the contract the biggest Waste to Energy plant in Baltics and the first in Estonia will be constructed. The contract includes manufacturing and erection of steel structures. Maru THM OÜ is responsible for erection works.

WTE Plant will be completed in 2013.

AS Maru Metall signed a contract with AS Merko Ehitus Eesti on 17th of August in 2011. According to the contract the biggest Waste to Energy plant in Baltic and the first in Estonia has to be established. The contract includes manufacturing and steel structures erection. AS Maru Metall produces assemblies and Maru THM OÜ is responsible for erection works.  The project total capacity is about 850 tons of steel structures and additionally  45 tons of handrails, 1300 m2 of gratings, 300 m2 tear drop plates etc. More than  50%  from all capacity were welded beams and welded columns. The project biggest beam total weight is almost 20 tons.

Description

In Spring 2015 Maru Metall AS signed a contract to produce steel frames for 40 MW Pellet-fired Heating Plant in Turku, Finland. The contract involves the production of about 155 tons of steel structures, in addition railings, gratings, steps, etc.