Industrial Building for Waste Handling

Description

In the beginning of the year 2014 AS Maru Metall and Maru Rakennus OY signed a contract to produce steel structures for a heating plant. The contract includes the production of about 80 t of steel structures, including ladders, handrails, grilles, steps, etc..
The building will be finished in 2014.

Description

AS Maru Metall produced steel constructions for CHP in Oskarshamn, Sweden. Total 290 T of steel.

Description

The project total capacity is about 650 tons of steel structures and additionally handrails, gratings etc. Karlstad CHP was completed in 2014.

Description

AS Maru Metallsigned a contract in the summer of 2015 to produce a steel frame for biomass fired steam boiler plant in Lahti.The contract witholds ca 180 tons of steel, in addition railings, gratings, steps, etc. The building is finished in 2015.

Description

PVC hangar 54,3 x 72,3 x 5,5 m with a canopy and loading dock

Steel structures
Wall panels
SBS roofing

Maru Metall AS: production