{"id":7365,"date":"2023-01-31T13:36:00","date_gmt":"2023-01-31T10:36:00","guid":{"rendered":"https:\/\/maru.ee\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/"},"modified":"2026-09-01T15:53:50","modified_gmt":"2026-09-01T12:53:50","slug":"a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street","status":"publish","type":"post","link":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/","title":{"rendered":"A seven-story commercial and residential building is being constructed at 6a Tatari Street"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Just before the New Year, we began <a href=\"https:\/\/mbt.ee\/tegevusvaldkonnad\/betoonitood\/\">concrete work<\/a> at the Tatari 6a site. Tatari 6a will be a seven-story commercial and residential building with a basement, totaling nearly 5,600 square meters. We have started <a href=\"https:\/\/mbt.ee\/tegevusvaldkonnad\/porandatood\/\">by installing the load-bearing floor slab<\/a> on the basement ground, we have started <a href=\"https:\/\/mbt.ee\/tegevusvaldkonnad\/betoonitood\/\">constructing the waterproof exterior walls of the basement<\/a>, work on the interior walls of the basement is underway, and preparations are being made to build the vehicle ramp. Construction in a dense downtown environment presents its own challenges; we ask our neighbors to be patient\u2014we\u2019re making a bit of a commotion, but soon this impressive addition to the Tatari Quarter, designed by Alver Architects, will be complete.   <\/p>\n\n<p class=\"wp-block-paragraph\">Since the building is being constructed in the Tatari neighborhood, which has very heavy car and pedestrian traffic, and is situated between commercial spaces and apartment buildings that operate on a daily basis, the organization and logistics of the construction work present their own challenges. Due to the confined conditions, the only location for installing the tower crane on the site is inside the future elevator shaft. The scope of our work includes pouring over 2,000 m\u00b3 of concrete, nearly 8,000 m\u00b2 of formwork, and over 200 metric tons of rebar.  <\/p>\n\n<p class=\"wp-block-paragraph\">We thank Mitt&amp;Perlebach for their trust and are pleased that our long-standing collaboration will continue with the construction of the structural frame for this project. We wish the Maru <a href=\"https:\/\/mbt.ee\/tegevusvaldkonnad\/betoonitood\/\">Betoonit\u00f6\u00f6d<\/a> team all the best and strength as they carry out the work! <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1920\" height=\"2560\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-3.jpg\" alt=\"\" class=\"wp-image-5280\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6324-scaled-1.jpg\" alt=\"\" class=\"wp-image-5283\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"Just before the New Year, we began concrete work at the Tatari 6a site. Tatari 6a will be a seven-story commercial and residential building with a basement, totaling nearly 5,600 square meters. We have started by installing the load-bearing floor slab on the basement ground, we have started constructing the waterproof exterior walls of the [&hellip;]","protected":false},"author":4,"featured_media":5276,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[261],"tags":[],"class_list":["post-7365","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-concrete-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>A seven-story commercial and residential building is being constructed at 6a Tatari Street - MARU<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"A seven-story commercial and residential building is being constructed at 6a Tatari Street - MARU\" \/>\n<meta property=\"og:description\" content=\"Just before the New Year, we began concrete work at the Tatari 6a site. Tatari 6a will be a seven-story commercial and residential building with a basement, totaling nearly 5,600 square meters. We have started by installing the load-bearing floor slab on the basement ground, we have started constructing the waterproof exterior walls of the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/\" \/>\n<meta property=\"og:site_name\" content=\"MARU\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-31T10:36:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-01T12:53:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kevin Roomet\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kevin Roomet\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/\"},\"author\":{\"name\":\"Kevin Roomet\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"headline\":\"A seven-story commercial and residential building is being constructed at 6a Tatari Street\",\"datePublished\":\"2023-01-31T10:36:00+00:00\",\"dateModified\":\"2026-09-01T12:53:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/\"},\"wordCount\":262,\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_6322-scaled-1.jpg\",\"articleSection\":[\"Concrete Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/\",\"name\":\"A seven-story commercial and residential building is being constructed at 6a Tatari Street - MARU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_6322-scaled-1.jpg\",\"datePublished\":\"2023-01-31T10:36:00+00:00\",\"dateModified\":\"2026-09-01T12:53:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_6322-scaled-1.jpg\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_6322-scaled-1.jpg\",\"width\":1920,\"height\":2560},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maru.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"A seven-story commercial and residential building is being constructed at 6a Tatari Street\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"name\":\"MARU\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maru.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\",\"name\":\"Maru Grupp\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"width\":696,\"height\":696,\"caption\":\"Maru Grupp\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/maru-group-page\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\",\"name\":\"Kevin Roomet\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"caption\":\"Kevin Roomet\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"A seven-story commercial and residential building is being constructed at 6a Tatari Street - MARU","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/","og_locale":"en_US","og_type":"article","og_title":"A seven-story commercial and residential building is being constructed at 6a Tatari Street - MARU","og_description":"Just before the New Year, we began concrete work at the Tatari 6a site. Tatari 6a will be a seven-story commercial and residential building with a basement, totaling nearly 5,600 square meters. We have started by installing the load-bearing floor slab on the basement ground, we have started constructing the waterproof exterior walls of the [&hellip;]","og_url":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/","og_site_name":"MARU","article_published_time":"2023-01-31T10:36:00+00:00","article_modified_time":"2026-09-01T12:53:50+00:00","og_image":[{"width":1920,"height":2560,"url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-1.jpg","type":"image\/jpeg"}],"author":"Kevin Roomet","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kevin Roomet","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#article","isPartOf":{"@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/"},"author":{"name":"Kevin Roomet","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"headline":"A seven-story commercial and residential building is being constructed at 6a Tatari Street","datePublished":"2023-01-31T10:36:00+00:00","dateModified":"2026-09-01T12:53:50+00:00","mainEntityOfPage":{"@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/"},"wordCount":262,"publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"image":{"@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-1.jpg","articleSection":["Concrete Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/","url":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/","name":"A seven-story commercial and residential building is being constructed at 6a Tatari Street - MARU","isPartOf":{"@id":"https:\/\/maru.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#primaryimage"},"image":{"@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-1.jpg","datePublished":"2023-01-31T10:36:00+00:00","dateModified":"2026-09-01T12:53:50+00:00","breadcrumb":{"@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#primaryimage","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-1.jpg","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6322-scaled-1.jpg","width":1920,"height":2560},{"@type":"BreadcrumbList","@id":"https:\/\/maru.ee\/en\/a-seven-story-commercial-and-residential-building-is-being-constructed-at-6a-tatari-street\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maru.ee\/en\/"},{"@type":"ListItem","position":2,"name":"A seven-story commercial and residential building is being constructed at 6a Tatari Street"}]},{"@type":"WebSite","@id":"https:\/\/maru.ee\/en\/#website","url":"https:\/\/maru.ee\/en\/","name":"MARU","description":"","publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maru.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maru.ee\/en\/#organization","name":"Maru Grupp","url":"https:\/\/maru.ee\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","width":696,"height":696,"caption":"Maru Grupp"},"image":{"@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/maru-group-page"]},{"@type":"Person","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a","name":"Kevin Roomet","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","caption":"Kevin Roomet"}}]}},"_links":{"self":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/comments?post=7365"}],"version-history":[{"count":1,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7365\/revisions"}],"predecessor-version":[{"id":7366,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7365\/revisions\/7366"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media\/5276"}],"wp:attachment":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media?parent=7365"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/categories?post=7365"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/tags?post=7365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}