{"id":7303,"date":"2024-03-12T13:51:00","date_gmt":"2024-03-12T10:51:00","guid":{"rendered":"https:\/\/maru.ee\/the-concrete-building-of-the-year-competition-is-underway-once-again\/"},"modified":"2026-09-01T15:33:19","modified_gmt":"2026-09-01T12:33:19","slug":"the-concrete-building-of-the-year-competition-is-underway-once-again","status":"publish","type":"post","link":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/","title":{"rendered":"The Concrete Building of the Year competition is underway once again."},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Concrete Building of the Year competition is underway once again, and this year we are represented by no fewer than three projects: the office building at 56 Tammsaare Street, the P\u00f6\u00f6rise residential area, and <a href=\"https:\/\/www.radissonhotels.com\/en-us\/hotels\/radisson-red-helsinki\">the Radisson RED hotel in Helsinki<\/a>.<\/p>\n\n<p class=\"wp-block-paragraph\">For the construction of the modern and contemporary office building at Tammsaare tee 56, developed by @USRE, we were responsible for the structural design and the entirety of the concrete and structural framework work. The monolithic concrete, open-plan structural framework allows the building to be adapted as needed over its long service life; concrete surfaces are exposed in the exterior structures, the parking garage, and the ceilings of the office building\u2019s standard floors. <\/p>\n\n<p class=\"wp-block-paragraph\">In the P\u00f6\u00f6rise neighborhood, we have built the concrete floors for all the buildings, the foundations for four buildings, and the floors of the parking garage for the developer @TTP over the years. Although the buildings appear identical at first glance, each project has presented its own challenges; the conditions for laying the foundations have varied, organizing work between access roads and buildings in use by residents has presented different challenges each time, and even performing the same tasks at different times of the year varies from one situation to another. <\/p>\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.radissonhotels.com\/en-us\/hotels\/radisson-red-helsinki\">The Radisson RED Hotel<\/a> in Helsinki, located at Vuorikatu 24, vividly illustrates our long-standing presence in our second home city, Helsinki. This building was constructed on the site of the former historic Helsinki Weather Station\u2014S\u00e4\u00e4talo\u2014in the city center; it is situated on a narrow cul-de-sac between a primary school that has been in continuous operation and a residential building, on the edge of the beautiful Kaisaniemi Park. The hotel\u2019s technical rooms, the shelter required by Finnish law, and the connection to the downtown car tunnel built to serve the hotel were constructed in a recess carved and blasted into the bedrock over a depth of nearly three stories, with the underground spaces also situated on different levels. In constructing the building\u2019s monolithic frame, we followed clear instructions provided by the client and the architect. The building\u2019s frame consists of load-bearing stairwells and elevator shafts in the above-ground section, as well as prefabricated partition walls. The intermediate floors are made of monolithic concrete, recessed in the shower areas and reinforced with a stiffening edge beam along the perimeter to prevent facade sagging. Our craftsmanship is rationally showcased in the interior spaces of the completed building; unfortunately, the more fascinating underground structures remain hidden from the average visitor.      <\/p>\n\n<p class=\"wp-block-paragraph\">In previous years, we have participated in the annual Concrete Structure Competition with several landmark projects. In 2013, we were involved in the completion of <strong>the \u00dclemiste Interchange<\/strong>, which won the grand prize; our contribution included nearly a kilometer of retaining walls and the supporting columns of the Tartu Road viaduct. In 2014, we participated in the competition with the apartment building at <strong>Pirita Road 26<\/strong>. In 2016, we constructed the concrete frame and floors for <strong>the Karl Storz Video Endoscopy production and office building<\/strong>, which won a special prize for its architectural facade design. In 2016, we also participated <strong>in the Tartu Lydia Hotel project,<\/strong> where we were responsible for designing and constructing the monolithic, waterproof concrete structures for the basement levels. In 2017, we participated in a competition for <strong>the Tallinn tram line infrastructure<\/strong>, where we constructed <strong>the Airport tram stop\u2019s<\/strong> airy canopy and the specially shaped black concrete features in the plaza in front of the stop. In 2018, we won the grand prize for the construction of <strong>the<\/strong> <strong>new<\/strong> <strong>main building<\/strong> <strong>of the Estonian Academy of Arts<\/strong> and a special prize for <strong>the Roseni 9\/11 hotel-apartment-office building<\/strong>. The EAA\u2019s new main building integrates industrial structures built in different eras into a contemporary school complex; the building features exposed monolithic concrete as its load-bearing framework in the walls, columns, and ceilings, both in the exterior structures and inside the building. The Roseni 9\/11 building features monolithic surfaces with a red concrete slab pattern, as well as arches, staircases, columns, walls, and ceilings. In 2019, <strong>the<\/strong> Utilitase <strong>Mustam\u00e4e CHP building<\/strong> participated in the competition, demonstrating that even industrial building structures can offer an aesthetic experience. In 2021, we were represented <strong>by the Lahekalda apartment buildings<\/strong> constructed by Merko, where we built the buildings\u2019 foundations and the monolithic load-bearing structures of the first floor. In 2022, we contributed to <strong>the completion of the J\u00e4rve Towers<\/strong>, which won the Concrete Building of the Year award; we constructed the buildings\u2019 concrete floors, ramps, and technical shelters. We also constructed nearly 8,000 m\u00b2 of concrete floors <strong>for the Kalaranna Quarter<\/strong>, which was a finalist in the competition.            <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg\" alt=\"\" class=\"wp-image-4567\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1288\" height=\"966\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/20210524_101551.jpg\" alt=\"\" class=\"wp-image-4928\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/RadissonRED__DJI_0899_084-scaled-1.jpg\" alt=\"\" class=\"wp-image-4930\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"The Concrete Building of the Year competition is underway once again, and this year we are represented by no fewer than three projects: the office building at 56 Tammsaare Street, the P\u00f6\u00f6rise residential area, and the Radisson RED hotel in Helsinki. For the construction of the modern and contemporary office building at Tammsaare tee 56, [&hellip;]","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[257,261],"tags":[],"class_list":["post-7303","post","type-post","status-publish","format-standard","hentry","category-maru-group","category-concrete-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Concrete Building of the Year competition is underway once again. - MARU<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Concrete Building of the Year competition is underway once again. - MARU\" \/>\n<meta property=\"og:description\" content=\"The Concrete Building of the Year competition is underway once again, and this year we are represented by no fewer than three projects: the office building at 56 Tammsaare Street, the P\u00f6\u00f6rise residential area, and the Radisson RED hotel in Helsinki. For the construction of the modern and contemporary office building at Tammsaare tee 56, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/\" \/>\n<meta property=\"og:site_name\" content=\"MARU\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-12T10:51:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-01T12:33:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kevin Roomet\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kevin Roomet\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/\"},\"author\":{\"name\":\"Kevin Roomet\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"headline\":\"The Concrete Building of the Year competition is underway once again.\",\"datePublished\":\"2024-03-12T10:51:00+00:00\",\"dateModified\":\"2026-09-01T12:33:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/\"},\"wordCount\":774,\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_0211-scaled.jpg\",\"articleSection\":[\"Maru Group\",\"Concrete Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/\",\"name\":\"The Concrete Building of the Year competition is underway once again. - MARU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_0211-scaled.jpg\",\"datePublished\":\"2024-03-12T10:51:00+00:00\",\"dateModified\":\"2026-09-01T12:33:19+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_0211-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_0211-scaled.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-concrete-building-of-the-year-competition-is-underway-once-again\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maru.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The Concrete Building of the Year competition is underway once again.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"name\":\"MARU\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maru.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\",\"name\":\"Maru Grupp\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"width\":696,\"height\":696,\"caption\":\"Maru Grupp\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/maru-group-page\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\",\"name\":\"Kevin Roomet\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"caption\":\"Kevin Roomet\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Concrete Building of the Year competition is underway once again. - MARU","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/","og_locale":"en_US","og_type":"article","og_title":"The Concrete Building of the Year competition is underway once again. - MARU","og_description":"The Concrete Building of the Year competition is underway once again, and this year we are represented by no fewer than three projects: the office building at 56 Tammsaare Street, the P\u00f6\u00f6rise residential area, and the Radisson RED hotel in Helsinki. For the construction of the modern and contemporary office building at Tammsaare tee 56, [&hellip;]","og_url":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/","og_site_name":"MARU","article_published_time":"2024-03-12T10:51:00+00:00","article_modified_time":"2026-09-01T12:33:19+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg","type":"image\/jpeg"}],"author":"Kevin Roomet","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kevin Roomet","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#article","isPartOf":{"@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/"},"author":{"name":"Kevin Roomet","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"headline":"The Concrete Building of the Year competition is underway once again.","datePublished":"2024-03-12T10:51:00+00:00","dateModified":"2026-09-01T12:33:19+00:00","mainEntityOfPage":{"@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/"},"wordCount":774,"publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"image":{"@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg","articleSection":["Maru Group","Concrete Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/","url":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/","name":"The Concrete Building of the Year competition is underway once again. - MARU","isPartOf":{"@id":"https:\/\/maru.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#primaryimage"},"image":{"@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg","datePublished":"2024-03-12T10:51:00+00:00","dateModified":"2026-09-01T12:33:19+00:00","breadcrumb":{"@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#primaryimage","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_0211-scaled.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/maru.ee\/en\/the-concrete-building-of-the-year-competition-is-underway-once-again\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maru.ee\/en\/"},{"@type":"ListItem","position":2,"name":"The Concrete Building of the Year competition is underway once again."}]},{"@type":"WebSite","@id":"https:\/\/maru.ee\/en\/#website","url":"https:\/\/maru.ee\/en\/","name":"MARU","description":"","publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maru.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maru.ee\/en\/#organization","name":"Maru Grupp","url":"https:\/\/maru.ee\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","width":696,"height":696,"caption":"Maru Grupp"},"image":{"@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/maru-group-page"]},{"@type":"Person","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a","name":"Kevin Roomet","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","caption":"Kevin Roomet"}}]}},"_links":{"self":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/comments?post=7303"}],"version-history":[{"count":1,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7303\/revisions"}],"predecessor-version":[{"id":7304,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7303\/revisions\/7304"}],"wp:attachment":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media?parent=7303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/categories?post=7303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/tags?post=7303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}