{"id":7281,"date":"2024-08-10T13:19:00","date_gmt":"2024-08-10T10:19:00","guid":{"rendered":"https:\/\/maru.ee\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/"},"modified":"2026-09-01T15:27:27","modified_gmt":"2026-09-01T12:27:27","slug":"the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place","status":"publish","type":"post","link":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/","title":{"rendered":"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">In collaboration with TREV2, we have moved on to the next phase of the Rail Baltica project: we are constructing the Parila viaduct and bridge near Rapla. We are carrying out this project as joint bidders, which provides the client with certainty and peace of mind and allows the parties to focus on planning and executing the work phases that are most important to them. <\/p>\n\n<p class=\"wp-block-paragraph\">The Parila viaduct, with a total length of 90 meters and piers reaching heights of 11\u201312 meters, is a key infrastructure project on the Rapla\u2013M\u00e4rjamaa road. For this project, we are using the Doka formwork system to construct the deck slab, along with the familiar Tenter edge beam trusses. Our main partner for rebar is Kaunas Metal, and our concrete supplier is Betoonimeister. During the work, we will pour a total of nearly 1,500 cubic meters of concrete on the viaduct and use nearly 3,000 square meters of formwork, of which more than 1,500 square meters will be base formwork. In addition, the construction of the bridge is still ahead of us.   <\/p>\n\n<p class=\"wp-block-paragraph\">Construction work has proceeded under challenging conditions, as we have been working both in heavy rain and during heat waves, alongside a road with heavy traffic. We are currently finishing the installation of the deck slab formwork and beginning to reinforce the deck slab. <\/p>\n\n<p class=\"wp-block-paragraph\">We wish the Maru Betoonit\u00f6\u00f6d team and our partner Trev2 success and perseverance in completing this important phase.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5439-scaled-1.jpeg\" alt=\"\" class=\"wp-image-4876\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_6203-scaled-1.jpg\" alt=\"\" class=\"wp-image-4878\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"In collaboration with TREV2, we have moved on to the next phase of the Rail Baltica project: we are constructing the Parila viaduct and bridge near Rapla. We are carrying out this project as joint bidders, which provides the client with certainty and peace of mind and allows the parties to focus on planning and [&hellip;]","protected":false},"author":4,"featured_media":4875,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[261],"tags":[],"class_list":["post-7281","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-concrete-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place - MARU<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place - MARU\" \/>\n<meta property=\"og:description\" content=\"In collaboration with TREV2, we have moved on to the next phase of the Rail Baltica project: we are constructing the Parila viaduct and bridge near Rapla. We are carrying out this project as joint bidders, which provides the client with certainty and peace of mind and allows the parties to focus on planning and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/\" \/>\n<meta property=\"og:site_name\" content=\"MARU\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-10T10:19:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-01T12:27:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5392-scaled-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kevin Roomet\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kevin Roomet\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/\"},\"author\":{\"name\":\"Kevin Roomet\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"headline\":\"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place\",\"datePublished\":\"2024-08-10T10:19:00+00:00\",\"dateModified\":\"2026-09-01T12:27:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/\"},\"wordCount\":252,\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_5392-scaled-1.jpeg\",\"articleSection\":[\"Concrete Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/\",\"name\":\"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place - MARU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_5392-scaled-1.jpeg\",\"datePublished\":\"2024-08-10T10:19:00+00:00\",\"dateModified\":\"2026-09-01T12:27:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_5392-scaled-1.jpeg\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/IMG_5392-scaled-1.jpeg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maru.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"name\":\"MARU\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maru.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\",\"name\":\"Maru Grupp\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"width\":696,\"height\":696,\"caption\":\"Maru Grupp\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/maru-group-page\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\",\"name\":\"Kevin Roomet\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"caption\":\"Kevin Roomet\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place - MARU","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/","og_locale":"en_US","og_type":"article","og_title":"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place - MARU","og_description":"In collaboration with TREV2, we have moved on to the next phase of the Rail Baltica project: we are constructing the Parila viaduct and bridge near Rapla. We are carrying out this project as joint bidders, which provides the client with certainty and peace of mind and allows the parties to focus on planning and [&hellip;]","og_url":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/","og_site_name":"MARU","article_published_time":"2024-08-10T10:19:00+00:00","article_modified_time":"2026-09-01T12:27:27+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5392-scaled-1.jpeg","type":"image\/jpeg"}],"author":"Kevin Roomet","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kevin Roomet","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#article","isPartOf":{"@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/"},"author":{"name":"Kevin Roomet","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"headline":"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place","datePublished":"2024-08-10T10:19:00+00:00","dateModified":"2026-09-01T12:27:27+00:00","mainEntityOfPage":{"@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/"},"wordCount":252,"publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"image":{"@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5392-scaled-1.jpeg","articleSection":["Concrete Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/","url":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/","name":"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place - MARU","isPartOf":{"@id":"https:\/\/maru.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#primaryimage"},"image":{"@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5392-scaled-1.jpeg","datePublished":"2024-08-10T10:19:00+00:00","dateModified":"2026-09-01T12:27:27+00:00","breadcrumb":{"@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#primaryimage","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5392-scaled-1.jpeg","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_5392-scaled-1.jpeg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/maru.ee\/en\/the-formwork-for-the-deck-slab-of-the-rail-baltica-parila-viaduct-is-in-place\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maru.ee\/en\/"},{"@type":"ListItem","position":2,"name":"The formwork for the deck slab of the Rail Baltica Parila Viaduct is in place"}]},{"@type":"WebSite","@id":"https:\/\/maru.ee\/en\/#website","url":"https:\/\/maru.ee\/en\/","name":"MARU","description":"","publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maru.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maru.ee\/en\/#organization","name":"Maru Grupp","url":"https:\/\/maru.ee\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","width":696,"height":696,"caption":"Maru Grupp"},"image":{"@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/maru-group-page"]},{"@type":"Person","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a","name":"Kevin Roomet","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","caption":"Kevin Roomet"}}]}},"_links":{"self":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7281","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/comments?post=7281"}],"version-history":[{"count":1,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7281\/revisions"}],"predecessor-version":[{"id":7282,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7281\/revisions\/7282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media\/4875"}],"wp:attachment":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media?parent=7281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/categories?post=7281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/tags?post=7281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}