{"id":7259,"date":"2025-01-16T12:39:00","date_gmt":"2025-01-16T09:39:00","guid":{"rendered":"https:\/\/maru.ee\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/"},"modified":"2026-09-01T15:59:52","modified_gmt":"2026-09-01T12:59:52","slug":"the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion","status":"publish","type":"post","link":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/","title":{"rendered":"The structural work on the MDSC Systems production building is nearing completion"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">We are pleased to announce that the team at Maru Betoonit\u00f6\u00f6d O\u00dc has reached the final stages of the structural work on MDSC Systems O\u00dc\u2019s new production building, which began last fall. Norte AS served as the building\u2019s lead designer, and our structural engineers and technicians also contributed to the completion of the structural design. During the project, approximately 500 m\u00b3 of monolithic concrete structures were constructed, nearly 4,000 m\u00b2 of wall formwork and 66 metric tons of rebar were installed, and approximately 500 steel and concrete elements were installed.  <\/p>\n\n<p class=\"wp-block-paragraph\">MDSC Systems O\u00dc\u2019s new office and production building is located in the Raku Business Park, which is being developed by Maru AS in Tallinn; the building has a total floor area of approximately 7,800 m\u00b2, of which the office complex accounts for 1,500 m\u00b2. Completion of the building is scheduled for July 2025.  <\/p>\n\n<p class=\"wp-block-paragraph\">We wish the other companies in the Maru Group\u2014Maru Ehitus AS and Maru THM O\u00dc\u2014the best of luck with the building\u2019s ongoing construction work. We will soon begin work there as well, laying approximately 6,800 m\u00b2 of concrete floors. <\/p>\n\n<p class=\"wp-block-paragraph\">At Maru Betoonit\u00f6\u00f6d O\u00dc, we provide comprehensive, end-to-end services for concrete and structural work on buildings and structures.<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2048\" height=\"1536\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/467002475_1113071580214747_7521233539835251593_n.jpg\" alt=\"\" class=\"wp-image-4828\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1928\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/IMG_20241210_115613-scaled-1.jpg\" alt=\"\" class=\"wp-image-4830\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"We are pleased to announce that the team at Maru Betoonit\u00f6\u00f6d O\u00dc has reached the final stages of the structural work on MDSC Systems O\u00dc\u2019s new production building, which began last fall. Norte AS served as the building\u2019s lead designer, and our structural engineers and technicians also contributed to the completion of the structural design. [&hellip;]","protected":false},"author":4,"featured_media":4827,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[261],"tags":[],"class_list":["post-7259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-concrete-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The structural work on the MDSC Systems production building is nearing completion - MARU<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The structural work on the MDSC Systems production building is nearing completion - MARU\" \/>\n<meta property=\"og:description\" content=\"We are pleased to announce that the team at Maru Betoonit\u00f6\u00f6d O\u00dc has reached the final stages of the structural work on MDSC Systems O\u00dc\u2019s new production building, which began last fall. Norte AS served as the building\u2019s lead designer, and our structural engineers and technicians also contributed to the completion of the structural design. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/\" \/>\n<meta property=\"og:site_name\" content=\"MARU\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-16T09:39:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-01T12:59:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/462562526_1111921617218906_8717750316311365022_n.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kevin Roomet\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kevin Roomet\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/\"},\"author\":{\"name\":\"Kevin Roomet\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"headline\":\"The structural work on the MDSC Systems production building is nearing completion\",\"datePublished\":\"2025-01-16T09:39:00+00:00\",\"dateModified\":\"2026-09-01T12:59:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/\"},\"wordCount\":212,\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/462562526_1111921617218906_8717750316311365022_n.jpg\",\"articleSection\":[\"Concrete Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/\",\"name\":\"The structural work on the MDSC Systems production building is nearing completion - MARU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/462562526_1111921617218906_8717750316311365022_n.jpg\",\"datePublished\":\"2025-01-16T09:39:00+00:00\",\"dateModified\":\"2026-09-01T12:59:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/462562526_1111921617218906_8717750316311365022_n.jpg\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/462562526_1111921617218906_8717750316311365022_n.jpg\",\"width\":2048,\"height\":1536},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maru.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The structural work on the MDSC Systems production building is nearing completion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"name\":\"MARU\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maru.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#organization\",\"name\":\"Maru Grupp\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/maru-logo-696-1.png\",\"width\":696,\"height\":696,\"caption\":\"Maru Grupp\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/maru-group-page\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\",\"name\":\"Kevin Roomet\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"caption\":\"Kevin Roomet\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The structural work on the MDSC Systems production building is nearing completion - MARU","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/","og_locale":"en_US","og_type":"article","og_title":"The structural work on the MDSC Systems production building is nearing completion - MARU","og_description":"We are pleased to announce that the team at Maru Betoonit\u00f6\u00f6d O\u00dc has reached the final stages of the structural work on MDSC Systems O\u00dc\u2019s new production building, which began last fall. Norte AS served as the building\u2019s lead designer, and our structural engineers and technicians also contributed to the completion of the structural design. [&hellip;]","og_url":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/","og_site_name":"MARU","article_published_time":"2025-01-16T09:39:00+00:00","article_modified_time":"2026-09-01T12:59:52+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/462562526_1111921617218906_8717750316311365022_n.jpg","type":"image\/jpeg"}],"author":"Kevin Roomet","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kevin Roomet","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#article","isPartOf":{"@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/"},"author":{"name":"Kevin Roomet","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"headline":"The structural work on the MDSC Systems production building is nearing completion","datePublished":"2025-01-16T09:39:00+00:00","dateModified":"2026-09-01T12:59:52+00:00","mainEntityOfPage":{"@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/"},"wordCount":212,"publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"image":{"@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/462562526_1111921617218906_8717750316311365022_n.jpg","articleSection":["Concrete Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/","url":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/","name":"The structural work on the MDSC Systems production building is nearing completion - MARU","isPartOf":{"@id":"https:\/\/maru.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#primaryimage"},"image":{"@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/462562526_1111921617218906_8717750316311365022_n.jpg","datePublished":"2025-01-16T09:39:00+00:00","dateModified":"2026-09-01T12:59:52+00:00","breadcrumb":{"@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#primaryimage","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/462562526_1111921617218906_8717750316311365022_n.jpg","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/462562526_1111921617218906_8717750316311365022_n.jpg","width":2048,"height":1536},{"@type":"BreadcrumbList","@id":"https:\/\/maru.ee\/en\/the-structural-work-on-the-mdsc-systems-production-building-is-nearing-completion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maru.ee\/en\/"},{"@type":"ListItem","position":2,"name":"The structural work on the MDSC Systems production building is nearing completion"}]},{"@type":"WebSite","@id":"https:\/\/maru.ee\/en\/#website","url":"https:\/\/maru.ee\/en\/","name":"MARU","description":"","publisher":{"@id":"https:\/\/maru.ee\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maru.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maru.ee\/en\/#organization","name":"Maru Grupp","url":"https:\/\/maru.ee\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/09\/maru-logo-696-1.png","width":696,"height":696,"caption":"Maru Grupp"},"image":{"@id":"https:\/\/maru.ee\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/maru-group-page"]},{"@type":"Person","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a","name":"Kevin Roomet","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","caption":"Kevin Roomet"}}]}},"_links":{"self":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/comments?post=7259"}],"version-history":[{"count":3,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7259\/revisions"}],"predecessor-version":[{"id":7394,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7259\/revisions\/7394"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media\/4827"}],"wp:attachment":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media?parent=7259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/categories?post=7259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/tags?post=7259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}