{"id":7225,"date":"2025-07-21T11:09:00","date_gmt":"2025-07-21T08:09:00","guid":{"rendered":"https:\/\/maru.ee\/next-stop-rail-baltica-ulemiste-station\/"},"modified":"2026-09-01T15:02:15","modified_gmt":"2026-09-01T12:02:15","slug":"next-stop-rail-baltica-ulemiste-station","status":"publish","type":"post","link":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/","title":{"rendered":"Next stop: Rail Baltica \u00dclemiste Station"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Where landmarks rise and records are broken, Maru Concrete Works is on the job!<\/p>\n\n<p class=\"wp-block-paragraph\">We are honored that Merko Ehitus Eesti and KMG Infra have selected Maru Betoonit\u00f6\u00f6d to perform the concrete work for the second phase of the 0-cycle at the Rail Baltica \u00dclemiste Terminal.<\/p>\n\n<p class=\"wp-block-paragraph\">Our contract covers concrete work for Cycle 0 structures in the area south of the railroad tracks. In this area, which is nearly one kilometer long, we will construct foundations, retaining walls, ramps, and abutments, stairwells, elevator shafts, utility rooms, pedestrian tunnels, and tunnels with bridge deck slabs spanning them. The scope of work includes approximately 10,000 m\u00b3 of monolithic reinforced concrete structures, including structures with exposed surfaces, for which the concrete surface requirements have been coordinated in accordance with the guidelines provided by Zaha Hadid Architects.  <\/p>\n\n<p class=\"wp-block-paragraph\">Before starting work, we familiarized ourselves with the construction site together with the general contractor\u2019s team, and over the course of several weeks, we were able to thoroughly plan the work processes and prepare the team. A unique project requires special attention and can only be carried out thanks to thorough preparation and close cooperation with the client. <\/p>\n\n<p class=\"wp-block-paragraph\">We would like to thank Merko Ehitus and KMG Infra for their trust, and we wish all our partners a refreshing summer vacation before the active phase of the project begins: let\u2019s bring our dreams to life!<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2048\" height=\"1536\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/D494E8A6-467F-407E-B6B0-7A34FA2FEC7D_1_102_o-1.jpeg\" alt=\"\" class=\"wp-image-4771\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2048\" height=\"1536\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/BE7029ED-1BE6-405D-99A1-F060A6ADC2B6_1_102_o.jpeg\" alt=\"\" class=\"wp-image-4773\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"Where landmarks rise and records are broken, Maru Concrete Works is on the job! We are honored that Merko Ehitus Eesti and KMG Infra have selected Maru Betoonit\u00f6\u00f6d to perform the concrete work for the second phase of the 0-cycle at the Rail Baltica \u00dclemiste Terminal. Our contract covers concrete work for Cycle 0 structures [&hellip;]","protected":false},"author":4,"featured_media":4778,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[257,261],"tags":[],"class_list":["post-7225","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-maru-group","category-concrete-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Next stop: Rail Baltica \u00dclemiste Station - MARU<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Next stop: Rail Baltica \u00dclemiste Station - MARU\" \/>\n<meta property=\"og:description\" content=\"Where landmarks rise and records are broken, Maru Concrete Works is on the job! We are honored that Merko Ehitus Eesti and KMG Infra have selected Maru Betoonit\u00f6\u00f6d to perform the concrete work for the second phase of the 0-cycle at the Rail Baltica \u00dclemiste Terminal. Our contract covers concrete work for Cycle 0 structures [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/\" \/>\n<meta property=\"og:site_name\" content=\"MARU\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-21T08:09:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-01T12:02:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maru.ee\/wp-content\/uploads\/2025\/07\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kevin Roomet\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kevin Roomet\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/\"},\"author\":{\"name\":\"Kevin Roomet\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"headline\":\"Next stop: Rail Baltica \u00dclemiste Station\",\"datePublished\":\"2025-07-21T08:09:00+00:00\",\"dateModified\":\"2026-09-01T12:02:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/\"},\"wordCount\":235,\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg\",\"articleSection\":[\"Maru Group\",\"Concrete Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/\",\"name\":\"Next stop: Rail Baltica \u00dclemiste Station - MARU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg\",\"datePublished\":\"2025-07-21T08:09:00+00:00\",\"dateModified\":\"2026-09-01T12:02:15+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg\",\"width\":2048,\"height\":1536},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/next-stop-rail-baltica-ulemiste-station\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maru.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Next stop: Rail Baltica \u00dclemiste Station\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"name\":\"Template\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maru.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\",\"name\":\"Kevin Roomet\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"caption\":\"Kevin Roomet\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Next stop: Rail Baltica \u00dclemiste Station - MARU","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/","og_locale":"en_US","og_type":"article","og_title":"Next stop: Rail Baltica \u00dclemiste Station - MARU","og_description":"Where landmarks rise and records are broken, Maru Concrete Works is on the job! We are honored that Merko Ehitus Eesti and KMG Infra have selected Maru Betoonit\u00f6\u00f6d to perform the concrete work for the second phase of the 0-cycle at the Rail Baltica \u00dclemiste Terminal. Our contract covers concrete work for Cycle 0 structures [&hellip;]","og_url":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/","og_site_name":"MARU","article_published_time":"2025-07-21T08:09:00+00:00","article_modified_time":"2026-09-01T12:02:15+00:00","og_image":[{"width":2048,"height":1536,"url":"https:\/\/maru.ee\/wp-content\/uploads\/2025\/07\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg","type":"image\/jpeg"}],"author":"Kevin Roomet","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kevin Roomet","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#article","isPartOf":{"@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/"},"author":{"name":"Kevin Roomet","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"headline":"Next stop: Rail Baltica \u00dclemiste Station","datePublished":"2025-07-21T08:09:00+00:00","dateModified":"2026-09-01T12:02:15+00:00","mainEntityOfPage":{"@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/"},"wordCount":235,"image":{"@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2025\/07\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg","articleSection":["Maru Group","Concrete Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/","url":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/","name":"Next stop: Rail Baltica \u00dclemiste Station - MARU","isPartOf":{"@id":"https:\/\/maru.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#primaryimage"},"image":{"@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2025\/07\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg","datePublished":"2025-07-21T08:09:00+00:00","dateModified":"2026-09-01T12:02:15+00:00","author":{"@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"breadcrumb":{"@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#primaryimage","url":"https:\/\/maru.ee\/wp-content\/uploads\/2025\/07\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2025\/07\/854C9ED9-0E4B-404B-B075-F0540C801A39_1_102_o.jpeg","width":2048,"height":1536},{"@type":"BreadcrumbList","@id":"https:\/\/maru.ee\/en\/next-stop-rail-baltica-ulemiste-station\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maru.ee\/en\/"},{"@type":"ListItem","position":2,"name":"Next stop: Rail Baltica \u00dclemiste Station"}]},{"@type":"WebSite","@id":"https:\/\/maru.ee\/en\/#website","url":"https:\/\/maru.ee\/en\/","name":"Template","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maru.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a","name":"Kevin Roomet","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","caption":"Kevin Roomet"}}]}},"_links":{"self":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7225","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/comments?post=7225"}],"version-history":[{"count":1,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7225\/revisions"}],"predecessor-version":[{"id":7226,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7225\/revisions\/7226"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media\/4778"}],"wp:attachment":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media?parent=7225"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/categories?post=7225"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/tags?post=7225"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}