{"id":7188,"date":"2025-12-16T16:03:00","date_gmt":"2025-12-16T13:03:00","guid":{"rendered":"https:\/\/maru.ee\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/"},"modified":"2026-09-01T15:57:46","modified_gmt":"2026-09-01T12:57:46","slug":"construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing","status":"publish","type":"post","link":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/","title":{"rendered":"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing!"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Maru Betoonit\u00f6\u00f6d has gained momentum with the construction work on the \u00dclemiste Terminal. We began work at the end of August 2025, and as of today, work is underway along the entire construction section, which <strong>is nearly one kilometer long<\/strong>. This is a technically complex and logistically very demanding project, where work is being carried out alongside active rail and city traffic.  <\/p>\n\n<p class=\"wp-block-paragraph\">By the end of this year, we will have constructed approximately <strong>5,000 m\u00b3 of various concrete structures<\/strong> at the site. Our scope of work includes retaining walls, pedestrian and tram tunnels, substations, and other technical rooms, as well as numerous other reinforced concrete structures. Preparatory work for the construction of the platforms is also underway. Before Christmas, we will pour <strong>the concrete slab for the connecting tunnel<\/strong> linking the \u00dclemiste district with the city center, which will also serve as the deck slab for the railway viaduct.   <\/p>\n\n<p class=\"wp-block-paragraph\">The \u00dclemiste Terminal is a future international transportation hub that will connect the <strong>Rail Baltica<\/strong> high-speed rail line with the domestic <strong>Edelaraudtee<\/strong> rail network. The terminal is scheduled for completion in 2028, and construction will take place on the main freight and Edelaraudtee rail lines, which will remain in active use throughout the entire process; \u00dclemiste Station will remain operational during the entire construction period. This places high demands on the construction project in terms of both work planning and safety.  <\/p>\n\n<p class=\"wp-block-paragraph\">The property is located in an area with extremely heavy traffic\u2014between Tallinn\u2019s two largest shopping centers and in the immediate vicinity of the \u00dclemiste City business district. Traffic is particularly heavy in the run-up to the holidays, when train traffic, car traffic, and streams of pedestrians all converge. In such an environment, carrying out the work requires precise timing and smooth cooperation among all parties involved.  <\/p>\n\n<p class=\"wp-block-paragraph\">We have made good progress on the project thanks to the professional team of experienced engineers and foremen at Maru Betoonit\u00f6\u00f6d, as well as the excellent cooperation with the site teams of the general contractors <strong>KMG<\/strong> and <strong>Merko<\/strong>, with whom the work was thoroughly prepared well in advance.<\/p>\n\n<p class=\"wp-block-paragraph\">The \u00dclemiste Terminal is set to become one of the most significant new landmarks in Tallinn\u2019s cityscape. The architectural design was created by <strong>Zaha Hadid Architects<\/strong> in the United Kingdom and sets high aesthetic and technical standards for the concrete structures. We are constructing <strong>exposed concrete surfaces<\/strong> in accordance with the precise instructions of the architects and the Rail Baltica client, taking into account the formwork divisions, the pattern of the rebar holes, and the harmony of the concrete surfaces with the facade and steel structures.  <\/p>\n\n<p class=\"wp-block-paragraph\">Maru Concrete Works: Professional concrete services as a comprehensive solution for the construction of landmarks!<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1917\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120615_0242_D-scaled.jpg\" alt=\"\" class=\"wp-image-4665\"\/><\/figure>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1917\" src=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203115926_0204_D-scaled.jpg\" alt=\"\" class=\"wp-image-4667\"\/><\/figure>\n","protected":false},"excerpt":{"rendered":"Maru Betoonit\u00f6\u00f6d has gained momentum with the construction work on the \u00dclemiste Terminal. We began work at the end of August 2025, and as of today, work is underway along the entire construction section, which is nearly one kilometer long. This is a technically complex and logistically very demanding project, where work is being carried [&hellip;]","protected":false},"author":4,"featured_media":4664,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[261],"tags":[],"class_list":["post-7188","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-concrete-works"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of the Rail Baltica \u00dclemiste Terminal is in full swing! - MARU<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing! - MARU\" \/>\n<meta property=\"og:description\" content=\"Maru Betoonit\u00f6\u00f6d has gained momentum with the construction work on the \u00dclemiste Terminal. We began work at the end of August 2025, and as of today, work is underway along the entire construction section, which is nearly one kilometer long. This is a technically complex and logistically very demanding project, where work is being carried [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/\" \/>\n<meta property=\"og:site_name\" content=\"MARU\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-16T13:03:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-01T12:57:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120111_0216_D-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1919\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kevin Roomet\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kevin Roomet\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/\"},\"author\":{\"name\":\"Kevin Roomet\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"headline\":\"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing!\",\"datePublished\":\"2025-12-16T13:03:00+00:00\",\"dateModified\":\"2026-09-01T12:57:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/\"},\"wordCount\":458,\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_20251203120111_0216_D-scaled.jpg\",\"articleSection\":[\"Concrete Works\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/\",\"name\":\"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing! - MARU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_20251203120111_0216_D-scaled.jpg\",\"datePublished\":\"2025-12-16T13:03:00+00:00\",\"dateModified\":\"2026-09-01T12:57:46+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_20251203120111_0216_D-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/maru.ee\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DJI_20251203120111_0216_D-scaled.jpg\",\"width\":2560,\"height\":1919},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/maru.ee\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing!\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maru.ee\\\/en\\\/\",\"name\":\"Template\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maru.ee\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maru.ee\\\/en\\\/#\\\/schema\\\/person\\\/0052a2f8831a6119b71fbe1a5550164a\",\"name\":\"Kevin Roomet\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g\",\"caption\":\"Kevin Roomet\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing! - MARU","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/","og_locale":"en_US","og_type":"article","og_title":"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing! - MARU","og_description":"Maru Betoonit\u00f6\u00f6d has gained momentum with the construction work on the \u00dclemiste Terminal. We began work at the end of August 2025, and as of today, work is underway along the entire construction section, which is nearly one kilometer long. This is a technically complex and logistically very demanding project, where work is being carried [&hellip;]","og_url":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/","og_site_name":"MARU","article_published_time":"2025-12-16T13:03:00+00:00","article_modified_time":"2026-09-01T12:57:46+00:00","og_image":[{"width":2560,"height":1919,"url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120111_0216_D-scaled.jpg","type":"image\/jpeg"}],"author":"Kevin Roomet","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kevin Roomet","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#article","isPartOf":{"@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/"},"author":{"name":"Kevin Roomet","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"headline":"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing!","datePublished":"2025-12-16T13:03:00+00:00","dateModified":"2026-09-01T12:57:46+00:00","mainEntityOfPage":{"@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/"},"wordCount":458,"image":{"@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120111_0216_D-scaled.jpg","articleSection":["Concrete Works"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/","url":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/","name":"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing! - MARU","isPartOf":{"@id":"https:\/\/maru.ee\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#primaryimage"},"image":{"@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#primaryimage"},"thumbnailUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120111_0216_D-scaled.jpg","datePublished":"2025-12-16T13:03:00+00:00","dateModified":"2026-09-01T12:57:46+00:00","author":{"@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a"},"breadcrumb":{"@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#primaryimage","url":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120111_0216_D-scaled.jpg","contentUrl":"https:\/\/maru.ee\/wp-content\/uploads\/2026\/07\/DJI_20251203120111_0216_D-scaled.jpg","width":2560,"height":1919},{"@type":"BreadcrumbList","@id":"https:\/\/maru.ee\/en\/construction-of-the-rail-baltica-ulemiste-terminal-is-in-full-swing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/maru.ee\/en\/"},{"@type":"ListItem","position":2,"name":"Construction of the Rail Baltica \u00dclemiste Terminal is in full swing!"}]},{"@type":"WebSite","@id":"https:\/\/maru.ee\/en\/#website","url":"https:\/\/maru.ee\/en\/","name":"Template","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maru.ee\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/maru.ee\/en\/#\/schema\/person\/0052a2f8831a6119b71fbe1a5550164a","name":"Kevin Roomet","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/022d7781a7f27e7ffb9fa1c84b96060ce86c7eea6966bfeb82a5e94f1f6ca1fb?s=96&d=mm&r=g","caption":"Kevin Roomet"}}]}},"_links":{"self":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7188","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/comments?post=7188"}],"version-history":[{"count":3,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7188\/revisions"}],"predecessor-version":[{"id":7384,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/posts\/7188\/revisions\/7384"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media\/4664"}],"wp:attachment":[{"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/media?parent=7188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/categories?post=7188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maru.ee\/en\/wp-json\/wp\/v2\/tags?post=7188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}