2025. Nearly the entire Maru Group was involved in the construction of the magnet factory operated by Neo Performance Materials (NPM), a Canadian manufacturer of rare earth metals and permanent magnets, which opened in Narva in 2025. News of the opening of the plant, which cost 75 million euros, garnered worldwide attention and was covered by publications such as the Financial Times and the New York Times, among others.

NPM proudly emphasized that the plant was completed “on time, on budget, and to specification” (“on time, on budget, and on spec”). Thanks to an extremely trusting collaboration with the client, the design and construction work was based on a tight but realistic schedule drawn up by Maru. The plant was completed in just 500 days, and NPM executives commented in the media that in the United States, for example, this process would have taken four to five times as long.

Client NPM Narva, LLC
Location 33 Tehase Street, Narva
Country Estonia
Volume Enclosed net floor area of approximately 24,000 m²
Executed by Maru Ehitus AS, Maru Metall AS, Maru THM OÜ, Maru Betoonitööd OÜ
Field of work General Contracting, In-situ Concrete Works, Concrete Floors, Construction Design, Structural Steel Structures, Assembly
Object type Industrial and production facilities
Year of completion 2025