References
IRU CHP Plant
Customer: | AS Merko Ehitus Eesti |
Location: | Iru, Harjumaa, Estonia |
Project manager: | Alexander Samoylenko (Maru THM OÜ) |
Projektiinsener: | Mikk Helleste |
AS Maru Metall signed a contract with AS Merko Ehitus Eesti on 17th of August in 2011. According to the contract the biggest Waste to Energy plant in Baltic and the first in Estonia has to be established. The contract includes manufacturing and steel structures erection. AS Maru Metall produces assemblies and Maru THM OÜ is responsible for erection works. The project total capacity is about 850 tons of steel structures and additionally 45 tons of handrails, 1300 m2 of gratings, 300 m2 tear drop plates etc. More than 50% from all capacity were welded beams and welded columns. The project biggest beam total weight is almost 20 tons.
Similar references
Leppävirta Heating Plant
Industrial and Warehouse Buildings
Concrete Works for Machine Construction Workshop
Industrial and Warehouse Buildings
Narva 300 MW CFB elektrijaama ehituskonstruktsioonide betoonitööd
Industrial and Warehouse Buildings
AS Assistor tootmis- ja büroohoone
Industrial and Warehouse Buildings